Dock Electrical Safety

For public safety, the local fire protection districts at the Lake of the Ozarks and Village of Four Seasons require electrical inspections and permits for all private boat docks equipped with electric power. The electrical permit is in addition to the dock permit issued by Ameren MissouriĀ and requires a fee paid to the local fire department.

For more information the Link below will open a new Tab and take you to Ameren.com

https://www.ameren.com/missouri/lake-of-the-ozarks/dock-electrical-installations

https://www.ameren.com/missouri/lake-of-the-ozarks/permit-procedure

https://www.ameren.com/missouri/lake-of-the-ozarks

Be sure to return to inspectiondoc.com

(When a property located within the area of the Osage Beach or Lake OzarkĀ Fire Protection District or Village of Four Seasons transfers ownership, an inspection of the electrical system on the dock must be made by the Fire District or the Village in advance of transferring the dock permit to the new owners. A copy of this inspection approval must be submitted with the permit transfer application to Ameren Missouri.)

Ask your realtor or contact your local fire service and ameren ue for updated or more information on this.